How did we approach this project?
Quantitative analysis of the renovation plans
The renovation plans had already been drawn up by the architect. Based on the demolition and renovation drawings, a quantitative analysis was carried out to gain insight into the scope of the work. This determined which parts had to be demolished and which building components would be rebuilt.
Drawing up a draft overall plan
The lead times for each activity were determined based on the quantities established. These activities were then linked together in a logical and efficient manner, resulting in an initial draft of the overall plan.
Drawing up the final overall planĀ
The draft plan was coordinated with the Aviolanda team. Based on their input, optimizations and corrections were made. This resulted in a final, supported overall plan that serves as a steering tool for further implementation.